ProcessText-only • studio-grade layout

Process

Freeze points and checkpoints—the practical path to predictable delivery.

Deliverables you can hold
  • Production drawings (shop-ready)
  • BOM / cut lists / finish notes
  • Checkpoint evidence (photo/video)
  • Packaged delivery with labeling
4–6
weeks typical lead time*
3
checkpoints before shipping
* Depends on scope, materials, and location.

Process

Freeze points + checkpoints = predictability.
Step-by-step
  1. Collect requirements (dimensions, references, budget, timeline)
  2. Confirm key decisions (optionally with 3D for complex items)
  3. Create production drawings + BOM + finish notes
  4. Design freeze: production starts after written approval
  5. Checkpoints: cutting / mid-assembly / pre-pack review (photo/video)
  6. Packaging, labeling, and delivery handoff
Checkpoint evidence
  • Cutting
    Confirm materials, dimensions, and cut lists.
  • Mid-assembly
    Catch alignment, joinery, and hardware placement.
  • Pre-pack
    Finish quality, labeling, and packaging integrity.